Scheduled oil sampling [electronic resource] : A proactive approach towards pollution prevention and waste minimization
- Published
- Washington, D.C. : United States. Dept. of Energy, 1995.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 5 pages : digital, PDF file
- Additional Creators
- United States. Department of Energy and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- The Waste Reduction Operations Complex (WROC) at the Idaho National Engineering Laboratory (INEL) maintains an emergency fire protection system which provides fire water during emergency conditions. The diesel engine driving this system receives regular preventative maintenance (PM) and servicing. The Waste Minimization Plan for WROC requires that all systems and processes be given a regular assessment to verify any Pollution Prevention (P2) or Waste Minimization (Waste Min.) activities. The WROC Maintenance group has implemented a proactive or best management practice (BMP) that reflects this P2/Waste Min. awareness. The diesel engine is operated for 30 minutes each week to maintain its readiness. A typical owner`s manual for industrial engines require that the oil be changed every 100-hours of operation or 6-months; only 13-hours of operation occur during the 6-months before the required oil change. Thirteen hours of operation would not warrant changing the oil. The WROC proactive approach to this problem is to perform an annual Scheduled Oil Sampling (SOS). An 8-ounce sample of oil is obtained and sent to a SOS lab. The SOS lab analyzes the condition (breakdown) of the oil and, provides a detailed analysis of metal particulates (from engine wear), and checks for impurities, such as, sulphur, water, coolant, and fuel in the system. The oil is changed only when the sampling results warrant that an oil change is necessary. The actual costs of the oil, filters, and labor far exceed the costs of performing the SOS. The projected cost savings after 8 years is about $12,000 in labor, oil changing costs, and hazardous waste analysis.
- Report Numbers
- E 1.99:inel--95/00192
E 1.99: conf-9504207--2
conf-9504207--2
inel--95/00192 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
11/01/1995.
"inel--95/00192"
" conf-9504207--2"
"DE96001928"
Hazardous waste and materials conference, Pocatello, ID (United States), 17-19 Apr 1995.
Reece, C.; Zirker, L.
EG and G Idaho, Inc., Idaho Falls, ID (United States) - Funding Information
- AC07-94ID13223
View MARC record | catkey: 13600196