Advanced Turbine Systems program conceptual design and product development. Quarterly report, February--April 1994 [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1995.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 14 pages : digital, PDF file
- Additional Creators
- United States. Department of Energy and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- Task 8.5 (active clearance control) was replaced with a test of the 2600F prototype turbine (Task 8.1T). Test 8.1B (Build/Teardown of prototype turbine) was added. Tasks 4 (conversion of gas-fired turbine to coal-fired turbine) and 5 (market study) were kicked off in February. Task 6 (conceptual design) was also initiated. Task 8.1 (advanced cooling technology) now has an approved test plan. Task 8.4 (ultra low NOx combustion technology) has completed the code development and background gathering phase. Task 8.6 (two-phase cooling of turbine vanes) is proceeding well; initial estimates indicate that nearly 2/3 of required cooling flow can be eliminated.
- Report Numbers
- E 1.99:doe/mc/29257--4005
doe/mc/29257--4005 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
02/01/1995.
"doe/mc/29257--4005"
"DE95000077"
Allison Engine Co., Indianapolis, IN (United States) - Funding Information
- AC21-93MC29257
View MARC record | catkey: 13600308