Actions for Simulated Coal Gas MCFC Power Plant System Verification [electronic resource].
Simulated Coal Gas MCFC Power Plant System Verification [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1998.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- vp : digital, PDF file
- Additional Creators
- Federal Energy Technology Center (U.S.), United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- Technical Report September 1998 This report was prepared as an account of work sponsored by an agency of the US Government. Neither the US Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owed rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the US Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the US Government or any agency thereof. This is the Technical Progress Report covering September 1998. All tasks have been completed, except for those discussed on the following pages. Unocal estimated the costs of dismantling and packaging the test facility for storage and shipment. The scope of work for the contract has been modified to accommodate the dismantling and packaging of the plant. An amendment to Sub-Contract No. MCP-9-UNO between M-C Power and Unocal has been executed which includes the Scope of Work in Unocal's cost estimate. Unocal continued maintenance of the 250-kW demonstration power plant. Bid packages for plant dismantling have been prepared and sent out to appropriate contractors for their proposals. A work plan and estimate for dismantling and packaging the plant for shipment has been prepared by Unocal. The plan has been reviewed by M-C Power and Bechtel with modifications made where appropriate. Unocal has obtained vendor qualifications for possible bidders who are acceptable to M-C Power. M-C Power has revised the bid packages to incorporate the modifications. Disassembly activities will proceed upon review of the proposals and subsequent releasing of a disassembly sub-contract. Shipment of the BOP from Unocal to M-C Power is expected to take place during December 1998.
- Report Numbers
- E 1.99:de--ac21-90mc27394--87
de--ac21-90mc27394--87 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
09/01/1998.
"de--ac21-90mc27394--87"
Scroppo, J.A. - Type of Report and Period Covered Note
- Topical; 09/01/1998 - 09/01/1998
- Funding Information
- AC21-90MC27394
View MARC record | catkey: 13833108