Engineering development of coal-fired high performance power systems, Phase II and III [electronic resource].
- Published:
- Washington, D.C. : United States. Dept. of Energy, 1999.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description:
- 84 pages : digital, PDF file
- Additional Creators:
- Federal Energy Technology Center (U.S.), United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- The goals of the program are to develop a coal-fired high performance power generation system (HIPPS) that is capable of: thermal efficiency (HHV) ≥ 47%; NOx, SOx, and particulates ≤ 10% NSPS (New Source Performance Standard) coal providing ≥ 65% of heat input; all solid wastes benign; cost of electricity ≤ 90% of present plants. Phase 1, which began in 1992, focused on the analysis of various configurations of indirectly fired cycles and on technical assessments of alternative plant subsystems and components, including performance requirements, developmental status, design options, complexity and reliability, and capital and operating costs. Phase 1 also included preliminary R and D and the preparation of designs for HIPPS commercial plants approximately 300 MWe in size. This phase, Phase 2, involves the development and testing of plant subsystems, refinement and updating of the HIPPS commercial plant design, and the site selection and engineering design of a HIPPS prototype plant. Work reported herein is from: Task 2.1 HITAC Combustors; Task 2.2 HITAF Air Heaters; Task 6 HIPPS Commercial Plant Design Update.
- Report Numbers:
- E 1.99:de--ac22-95pc95144--22
de--ac22-95pc95144--22 - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
01/01/1999.
"de--ac22-95pc95144--22" - Funding Information:
- AC22-95PC95144
View MARC record | catkey: 13834726