CeraMem NO{sub x} catalytic filter 5000 ACFM field demonstration test plan [electronic resource] : Engineering development of a coal-fired low emissions boiler system Subtask 9.2, Subsystem test plan
- Published:
- Washington, D.C. : United States. Dept. of Energy, 1996.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description:
- 52 pages : digital, PDF file
- Additional Creators:
- ABB Inc, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- As a deliverable of the project, ABB Environmental Systems has written this subsystem test plan to outline and detail activities to be undertaken in Tasks 10 and 11 of the Low Emissions Boiler System project. This subsystem test plan includes the budget and schedule for the construction, modification and operation of the subsystem test unit. This subsystem test plan also discusses securing of all applicable construction and operating permits, completing all necessary agreements with any host facilities, management procedures for monitoring and controlling all procurement and construction activities, implementation of Quality Assurance/Quality Control (QA/QC) measures, data acquisition during operations, data analysis, and the startup and shutdown procedures of the test unit. The subsystem test plan is part of the updated Phase II RD&T Plan.
- Report Numbers:
- E 1.99:doe/pc/92159--t17
doe/pc/92159--t17 - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
06/18/1996.
"doe/pc/92159--t17"
"DE96050485" - Funding Information:
- AC22-92PC92159
View MARC record | catkey: 13837844