Pulsed atmospheric fluidized bed combustion. Technical progress report, January 1, 1993--March 31, 1993 [electronic resource].
Published
Washington, D.C. : United States. Dept. of Energy, 1993. Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy.
As reported in previous quarterly reports, the fabrication of the fluid bed vessel, hot cyclone, coal handling system components, and coal/limestone feed systems is underway. Procurement of long lead time items was initiated in October 1992, and.deliveries are being made on schedule. In this quarterly period the following design tasks were accomplished. Mass and energy balance review and optimization; system operation calibrations; piping pressure drop design calculations; and pipe sizing and layout drawings.