Actions for Tidd PFBC Demonstration Project fourth quarterly technical progress report, CY 1992 [electronic resource].
Tidd PFBC Demonstration Project fourth quarterly technical progress report, CY 1992 [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1993.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- Pages: (33 pages) : digital, PDF file
- Additional Creators
- United States. Department of Energy and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- This is the 23rd technical progress report submitted to the Department of Energy in connection with the cooperative agreement between the DOE and the Ohio Power Company for the Tidd PFBC Demonstration Plant. This report covers the period from October 1, 1992 to December 31, 1992. Major activities during this period involve: (1) The unit was operated for a total of 714 hours (including gas turbine air prewarming). There were seven gas turbine starts, seven bed preheater starts, and seven operating periods with coal fire. The peak gross output of 64 MWH was achieved for the period of 1000 to 1100 hours on November 23, 1992. The longest coal fire was 285 hours beginning at 1211 hours on November 25, 1992. (2) Total gross generation was 24,643, and coal consumption was 11,900 tons. (3) The hot gas clean up system was commissioned. (4) Active end fluidization system to address sparge duct cracking and deformation problem was jointly initiated by ABB carbon, B W and AEPSC. (5) All testing continued using Plum Run dolomite. This approach was taken as a conservative means to avoid sintering and unit trips which were encountered during the previous two start-ups in September using limestone and (6) monitoring of solid, liquid and gaseous waste streams, as detailed in the operations phase monitoring requirements in the EMP, were performed.
- Report Numbers
- E 1.99:doe/mc/24132-3359
doe/mc/24132-3359 - Subject(s)
- Other Subject(s)
- Coal
- Fluidized-Bed Combustion
- Fluidized-Bed Combustors
- Demonstration Programs
- Dolomite
- Gas Turbines
- Hot Gas Cleanup
- Monitoring
- Performance Testing
- Pressurization
- Progress Report
- Carbonaceous Materials
- Carbonate Minerals
- Chemical Reactions
- Combustion
- Combustors
- Document Types
- Energy Sources
- Equipment
- Fossil Fuels
- Fuels
- Machinery
- Materials
- Minerals
- Oxidation
- Purification
- Testing
- Thermochemical Processes
- Turbines
- Turbomachinery
- Note
- Published through SciTech Connect.
01/01/1993.
"doe/mc/24132-3359"
"DE93014529"
American Electric Power Service Corp., Columbus, OH (United States) - Funding Information
- FC21-87MC24132
View MARC record | catkey: 13840558