Actions for Coal-hydrogasification process development. Quarterly technical progress report, January 2, 1982-April 2, 1982 [electronic resource].
Coal-hydrogasification process development. Quarterly technical progress report, January 2, 1982-April 2, 1982 [electronic resource].
- Published
- Downey, Calif : Rockwell International, 1982.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- Pages: 12 : digital, PDF file
- Additional Creators
- Rockwell International and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- Principal activities were related to the ongoing receipt and acceptance test monitoring of advance procured components for the 3/4-TPH IPDU facility. Also continued were engineering contacts with two valve suppliers experiencing manufacturing problems with advance procured components. Both of these manufacturers appear to have solved their problems. Previously-ordered equipment such as the integral orifice delta-P flow transmitters and pressure gages were received. Final system configuration checkout of the Beckman MV-8000 microprocessor controller for the IPDU has been initiated and is rescheduled to be completed in the latter part of April 1982. Preparation of graphic control drawing has been completed by Rockwell Engineering, and a purchase order has been submitted to Beckman Instruments. Assembly and checkout of the acoustic emission (AE) monitoring equipment for the IPDU was resumed. All individual components and subassembly chassis were checked out, and assembly of the AE system was approximately 95% completed.
- Report Numbers
- E 1.99:doe/et/10328-42
doe/et/10328-42 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
04/01/1982.
"doe/et/10328-42"
"DE82013306" - Funding Information
- AC01-78ET10328
View MARC record | catkey: 13841888