1000kW on-site PAFC power plant development and demonstration [electronic resource].
- Published:
- Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1996.
- Physical Description:
- pages 12-15 : digital, PDF file
- Additional Creators:
- United States. Department of Energy. Office of Scientific and Technical Information
- Access Online:
- www.osti.gov
- Summary:
- Phosphoric Acid Fuel Cell Technology Research Association (PAFC-TRA) and New Energy and Industrial Technology Development Organization (NEDO) have been conducting a joint project on development of a 5000kW urban energy center type PAFC power plant (pressurized) and a 1000kW on-site PAFC power plant (non-pressurized). The objective of the technical development of 1000kW on-site PAFC power plant is to realize a medium size power plant with an overall efficiency of over 70% and an electrical efficiency of over 36%, that could be installed in a large building as a cogeneration system. The components and system integration development work and the plant design were performed in 1991 and 1992. Manufacturing of the plant and installation at the test site were completed in 1994. PAC test was carried out in 1994, and generation test was started in January 1995. Demonstration test is scheduled for 1995 and 1996.
- Subject(s):
- Note:
- Published through SciTech Connect., 12/31/1996., "conf-961107--absts.", "TI97001494", Fuel cell seminar, Kissimmee, FL (United States), 17-20 Nov 1996., Satomi, Tomohide; Koike, Shunichi; Ishikawa, Ryou., and Fuel Cell Seminar Organizing Committee (United States)
View MARC record | catkey: 14066876