Actions for Supplement analysis, Southpoint power project [electronic resource].
Supplement analysis, Southpoint power project [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1999.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 100 unnumbered pages : digital, PDF file
- Additional Creators
- United States. Department of Energy. Office of Management, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- The Calpine Corporation applied to interconnect its proposed power plant with the Western Area Power Administration`s (Western) Parker-Davis project in western Arizona. Western, as a major electric transmission system owner is required by existing policies and regulations, to provide access to its transmission system, when requested by an eligible organization. The proposed interconnection would integrate a major source of new generation into the Parker-Davis system which would allow Calpine to supply its power to the electric wholesale market. Based on this application, Western`s proposed action is to enter into an interconnection agreement with Calpine.
- Report Numbers
- E 1.99:doe/eis--0308-sa-1
doe/eis--0308-sa-1 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
03/16/1999.
"doe/eis--0308-sa-1"
"DE99002636"
"NONE"
View MARC record | catkey: 14091122