Rebaselining seismic risks for resumption of Building 707 plutonium operations at the Rocky Flats Plant [electronic resource].
Published
Washington, D.C. : United States. Dept. of Energy, 1993. Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy.
Natural phenomena risks have been assessed for plutonium handling facilities at the Rocky Flats Plant, based on numerous studies performed for the Department of Energy Natural Phenomena Hazards Project. The risk assessment was originally utilized in the facilities Final Safety Analysis Reports and in subsequent risk management decisions. Plutonium production operations were curtailed in 1989 in order for a new operating contractor to implement safety improvements. Since natural phenomena events dominated risks to the public, a re-assessment of these events were undertaken for resumption of plutonium operations.
Report Numbers
E 1.99:rfp--4729 E 1.99: conf-9310102--2 conf-9310102--2 rfp--4729
Published through SciTech Connect. 08/01/1993. "rfp--4729" " conf-9310102--2" "DE93018801" 4. energy natural phenomena hazards mitigation conference,Atlanta, GA (United States),19-22 Oct 1993. Elia, F. Jr.; Stahlnecker, E.; Foppe, T. EG and G Rocky Flats, Inc., Golden, CO (United States)