U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project [electronic resource] : Project plan
- Published
- Washington, D.C. : United States. Dept. of Energy, 1994.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 95 pages : digital, PDF file
- Additional Creators
- United States. Department of Energy and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date.
- Report Numbers
- E 1.99:doe/al/62350--61-rev.1
doe/al/62350--61-rev.1 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
09/01/1994.
"doe/al/62350--61-rev.1"
"DE95001278"
Jacobs Engineering Group, Inc., Albuquerque, NM (United States) - Type of Report and Period Covered Note
- Topical; 09/01/1994 - 09/01/1994
- Funding Information
- AC04-91AL62350
View MARC record | catkey: 14093599