Design analysis supporting 101-SY Water Decon System [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1995.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 90 pages : digital, PDF file
- Additional Creators
- Westinghouse Electric Corporation, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- This document contains the results of stress analysis and component sizing for the 101-SY mitigation pump, Water Decon System. Calculations included are a stress analysis of the High Pressure Manifold, the threaded connection on the Yoke Water Connector and a sizing of an air receiver tank.
- Report Numbers
- E 1.99:whc-sd-wm-da--189
whc-sd-wm-da--189 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
09/05/1995.
"whc-sd-wm-da--189"
"DE96050105"
Cleveland, K.J. - Funding Information
- AC06-87RL10930
View MARC record | catkey: 14111730