In-Tank Precipitation Facility (ITP) and H-Tank Farm (HTF) geotechnical report, WSRC-TR-95-0057, Revision 0, Volume 4 [electronic resource].
- Published:
- Washington, D.C. : United States. Dept. of Energy, 1995.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description:
- 600 pages : digital, PDF file
- Additional Creators:
- Westinghouse Savannah River Company, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- A geotechnical study has been completed in H-Area for the In-Tank Precipitation Facility (ITP) and the balance of the H-Area Tank Farm (HTF) at the Savannah River Site (SRS) in South Carolina. The study consisted of subsurface field exploration, field and laboratory testing, and engineering analyses. The purpose of these investigations is to evaluate the overall stability of the H-Area tanks under static and dynamic conditions. The objectives of the study are to define the site-specific geological conditions at ITP and HTF, obtain engineering properties for the assessment of the stability of the native soils and embankment under static and dynamic loads (i.e., slope stability, liquefaction potential, and potential settlements), and derive properties for soil-structure interaction studies. This document (Volume 4) contains the laboratory test results for the In-Tank Precipitation Facility (ITP) and H-Tank Farm (HTF) Geotechnical Report.
- Report Numbers:
- E 1.99:wsrc-tr--95-0057-vol.4
wsrc-tr--95-0057-vol.4 - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
11/01/1995.
"wsrc-tr--95-0057-vol.4"
"DE96002158" - Funding Information:
- AC09-89SR18035
View MARC record | catkey: 14113408