Preliminary hazard analysis for the Brayton Isotope Ground Demonstration System (including vacuum test chamber) [electronic resource].
- Published:
- Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 1975.
- Physical Description:
- Pages: 20 : digital, PDF file
- Additional Creators:
- United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- The Preliminary Hazard Analysis (PHA) of the BIPS-GDS is a tabular summary of hazards and undesired events which may lead to system damage or failure and/or hazard to personnel. The PHA reviews the GDS as it is envisioned to operate in the Vacuum Test Chamber (VTC) of the GDS Test Facility. The VTC and other equipment which will comprise the test facility are presently in an early stage of preliminary design and will undoubtedly undergo numerous changes before the design is frozen. The PHA and the FMECA to follow are intended to aid the design effort by identifying areas of concern which are critical to the safety and reliability of the BIPS-GDS and test facility.
- Report Numbers:
- E 1.99:tid-27268
tid-27268 - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
11/30/1975.
"tid-27268"
Miller, L.G.
AiResearch Mfg. Co. of Arizona, Phoenix (USA) - Funding Information:
- EY-76-C-03-1123
View MARC record | catkey: 14118967