PLUTONIUM FINISHING PLANT (PFP) SUB-GRADE EE/CA EVALUATION OF ALTERNATIVES A NEW MODEL [electronic resource].
- Published:
- Washington, D.C. : United States. Dept. of Energy. Office of Environmental Management, 2007.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Additional Creators:
- Hanford Site (Wash.)
United States. Department of Energy. Office of Environmental Management
United States. Department of Energy. Office of Scientific and Technical Information - Access Online:
- www.osti.gov
- Summary:
- An engineering evaluation/cost analysis (EE/CA) was performed at the Hanford Site's Plutonium Finishing Plant (PFP). The purpose of the EVCA was to identify the sub-grade items to be evaluated; determine the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) hazardous substances through process history and available data; evaluate these hazards; and as necessary, identify the available alternatives to reduce the risk associated with the contaminants. The sub-grade EWCA considered four alternatives for an interim removal action: (1) No Action; (2) Surveillance and Maintenance (S&M); (3) Stabilize and Leave in Place (Stabilization); and (4) Remove, Treat and Dispose (RTD). Each alternative was evaluated against the CERCLA criteria for effectiveness, implementability, and cost.
- Subject(s):
- Note:
- Published through SciTech Connect.
06/08/2007.
"hnf-34063-fp rev 0"
2007 ANS TOPICAL MEETING ON DECOMMISSIONING & DECONTAMINATION & REUTILIZATION & TECHNOLOGY EXPO 09/16/2007 THRU 09/19/2007 CHATTANOOGA TN.
HOPKINS, A.M. - Funding Information:
- DE-AC06-96RL13200
View MARC record | catkey: 14130747