Actions for Shillapoo Wildlife Area, Annual Report 2006-2007 [electronic resource].
Shillapoo Wildlife Area, Annual Report 2006-2007 [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 2006.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 10 pages : digital, PDF file
- Additional Creators
- United States. Bonneville Power Administration, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- This report summarizes accomplishments, challenges and successes on WDFW's Shillapoo Wildlife Area funded under Bonneville Power Administration's (BPA) Wildlife Mitigation Program (BPA project No.2003-012-00) during the Fiscal Year 07 contract period October 1, 2006-September 30, 2007. The information presented here is intended to supplement that contained in BPA's PISCES contract development and reporting system. The organization below is by broad categories of work but references are made to individual work elements in the PISCES Statement of Work as appropriate. The greatest success realized during this contract period was significant positive changes in the vegetative community in several wetland basins throughout the wildlife area. This major goal is being achieved in part by new equipment and operation capability funded under the BPA contract, state capital and migratory bird stamp funds, and the past or ongoing investment of other partners including Ducks Unlimited, The Natural Resources Conservation Service (NRCS), Clark Public Utilities and others. We continue to be challenged by requirements under the archaeological and historic preservation act necessary to protect many sensitive sites known to occur within the wildlife area. The problems encountered to date have been largely administrative in nature and those experienced this year were unforeseen and probably unavoidable. Early in the contract period, WDFW and BPA had agreed to have a BPA staff archaeologist perform the survey and reporting work. Unexpectedly, just prior to the expected start date for the surveys, the employee resigned leaving BPA's staff short handed and necessitated contracting the work with an archaeological consultant. This delay caused us to forego work on several projects that are now deferred until the next contract period. The most notable projects impacted by this unfortunate circumstance are those involving the construction or repair of fences.
- Report Numbers
- E 1.99:p103779
p103779 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
10/01/2006.
"p103779"
Calkins, Brian. - Funding Information
- 29303
200301200
View MARC record | catkey: 14131959