Umatilla River Fish Passage Operations Program, 2001-2002 Annual Report [electronic resource].
- Published
- Portland, Ore : United States. Bonneville Power Administration, 2003.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 36 pages : digital, PDF file
- Additional Creators
- Confederated Tribes of the Umatilla Reservation, Oregon, United States. Bonneville Power Administration, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, Oregon is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from August 22, 2001 to September 12, 2002. A total of 5,519 summer steelhead (Oncorhynchus mykiss); 1,146 adult, 1,158 jack, and 970 subjack fall chinook (O. tshawytscha); 22,792 adult and 80 jack coho (O. kisutch); and 5,058 adult and 188 jack spring chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 261 adult and 14 jack spring chinook were hauled upstream from Threemile Dam for release. There were 5,359 summer steelhead; 622 adult, 1,041 jack and 867 subjack fall chinook; 22,513 adult and 76 jack coho; and 4,061 adult and 123 jack spring chinook either released at, or allowed to volitionally migrate past, Threemile Dam. In addition, 110 summer steelhead; 462 adult and 24 jack fall chinook; and 560 adult and 28 jack spring chinook were collected for brood. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The canal was open for 141 days between February 22 and July 12, 2002. During that period, fish were bypassed back to the river 134 days and were trapped 5 days. An estimated 200 pounds of juvenile fish were transported from Westland. Approximately 90% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was opened August 16, 2002. The bypass was run until October 31, 2001 with the exception of the period from August 29 to September 16. The bypass was reopened March 7, 2002 and ran until July 8. The juvenile trap was operated from July 8 to July 12 by the Umatilla Passage Evaluation project.
- Report Numbers
- E 1.99:doe/bp-00004112-2
doe/bp-00004112-2 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
02/01/2003.
"doe/bp-00004112-2"
Zimmerman, Brian C.; Duke, Bill B. - Funding Information
- 00004112
198802200
View MARC record | catkey: 14134304