Closure Report for CAU No. 430 [electronic resource] : Buried Depleted Uraniuim Artillery Round No. 1, Tonopah Test Range, Revision 0.
- Published
- Washington, D.C : United States. Dept. of Energy. Office of the Assistant Secretary for Defense Programs, 1997.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 26 : digital, PDF file
- Additional Creators
- National Wind Technology Center (U.S.), United States. Department of Energy. Office of the Assistant Secretary for Defense Programs, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- 1.1 Purpose This Closure Report presents the information obtained from investigative actions performed to justify the decision for clean closure of CAU 430 through "No Further Action." The investigative actions were performed per the Streamlined Approach for Environmental Restoration Plan, CA UNO. 430: Buried Depleted Uranium Artille~ Round No. 1, Tonopah Test Range (DOE/NV, 1996a) (hereafter referred to as the SAFER Plan). The Buried DU Artillery Round No. 1 is located approximately 1.1 kilometers (km) (0.7 mile [mi]) south of Avenue 13 in the test area south of Area 9 (Figure 1-2). The site was thought to consist of a potentially unexploded W-79 Joint Test Assembly (JTA) test artillery projectile with high explosives (HE) and DU. The DU was substituted for Special Nuclear Material to prevent a nuclear explosion and yet retain the physical characteristics of uranium for ballistic and other mechanical tests. The projectile was reportedly buried in one pit, approximately 5 to 10 feet (ft) deep (Smith, 1993; Smith, 1996; Quas, 1996). The exact location of the burial pit is unknown; however, three disturbed areas (Sites A, B, and C) were identified through geophysical surveys, site visits, and employee interviews as possible locations of the test projectile (Figure 1-3). Results of the investigation are summarized within this Closure Report. Additional information about the site and investigation activities may be found in the SAFER Plan (DOE/NV, 1996a). 1.2 Scope The objectives of the SAFER Plan (DOE/NV, 1996a) activities were to prepare the site for closure through locating and identi~ing the projectile (Buried DU Artillery Round No. 1), destroying the projectile and any remaining components, collecting soil samples to detect residual contamination resulting from projectile destruction, and finally, remediating residual contamination.
- Report Numbers
- E 1.99:doe/nv--469
doe/nv--469 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
02/25/1997.
"doe/nv--469"
"DE00001760"
International Technologies Corporation, Las Vegas, NV - Type of Report and Period Covered Note