Actions for Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report [electronic resource] : Attachment 2, Geology report, Final
Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report [electronic resource] : Attachment 2, Geology report, Final
- Published
- Washington, D.C. : United States. Dept. of Energy, 1994.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 199 pages : digital, PDF file
- Additional Creators
- United States. Department of Energy and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd³) (2.1 million cubic meters [m³]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd³ (15,000 m³) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd³ (420,000 m³). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd³ (2.58 million m³). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.
- Report Numbers
- E 1.99:doe/al/62350--24f-attach.2
doe/al/62350--24f-attach.2 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
06/01/1994.
"doe/al/62350--24f-attach.2"
"DE94018529"
"EW2010102/EX2040010"
Not Available.
Jacobs Engineering Group, Inc., Albuquerque, NM (United States) - Type of Report and Period Covered Note
- Final; 06/01/1994 - 06/01/1994
- Funding Information
- AC04-91AL62350
View MARC record | catkey: 14145959