Actions for Data Base Management Plan for the remedial investigation of Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee [electronic resource].
Data Base Management Plan for the remedial investigation of Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1992.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 10 pages : digital, PDF file
- Additional Creators
- Oak Ridge National Laboratory, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- The remedial investigation (RI) for Waste Area Grouping (WAG) 5 will involve gathering, verifying, analyzing, reporting, and archiving numerous types of field and analytical data. Field investigations will produce data documenting surficial and geophysical surveys, geologic and hydrogeologic logs, aquifer tests, water level measurements, geophysical logs, and stream and seepage flow measurements. Laboratory analyses will be performed on soil, surface water, groundwater, and sediment samples collected during field investigations. All data resulting from these activities will be contained in the Bechtel RI/feasibility study (FS) project data base and will be managed in accordance with the RI/FS Data Base Management Plan and this WAG-specific plan. This Data Base Management Plan describes the gathering, verifying, analyzing, reporting, and archiving of data generated during Bechtel`s remedial investigation of Waste Area Grouping 5. This investigation will produce data documenting surficial surveys, geophysical surveys, geologic and hydrologic logs, aquifer tests, water level measurements, geophysical logs, and stream and seep flow measurements. Also, laboratory analyses will be performed on soil, surface water, groundwater, and sediment samples. The 1500 series of Bechtel project procedures, ``Data Base Management,`` and the project Data Base Management Plan will be used to ensure that data are handled properly.
- Report Numbers
- E 1.99:ornl/er/sub--87-99053/50
ornl/er/sub--87-99053/50 - Subject(s)
- Other Subject(s)
- Data Base Management
- Planning
- Environment
- Information
- Information Systems
- Remedial Action
- Radioactive Waste Management
- Hazardous Materials
- Radioactive Waste Disposal
- Radioactive Wastes
- Data Acquisition
- Geophysical Surveys
- Surface Waters
- Ground Water
- Soils
- Geology
- Sampling
- Water Tables
- Aquifers
- Sediments
- Data Compilation
- Ornl
- Note
- Published through SciTech Connect.
07/01/1992.
"ornl/er/sub--87-99053/50"
"DE92019492" - Type of Report and Period Covered Note
- Topical; 07/01/1992 - 07/01/1992
- Funding Information
- AC05-84OR21400
View MARC record | catkey: 14147984