Utility Advanced Turbine Systems (ATS) technology readiness testing [electronic resource].
- Published:
- Washington, D.C. : United States. Dept. of Energy, 1999.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description:
- 81 pages : digital, PDF file
- Additional Creators:
- Federal Energy Technology Center (U.S.), United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted horn DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include fill speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown.
- Report Numbers:
- E 1.99:de--fc21-95mc31176-20
de--fc21-95mc31176-20 - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
05/01/1999.
"de--fc21-95mc31176-20" - Funding Information:
- FC21-95MC31176
View MARC record | catkey: 14152769