Commissioning and operation of the Nuclear Physics Injector at SLAC [electronic resource].
Published
Menlo Park, Calif. : Stanford Linear Accelerator Center, 1985. Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy.
The new Nuclear Physics Injector (NPI) approved for construction in October of 1983 was completed by September of 1984, and delivered short pulse beams for SPEAR ring checkout in mid-October. Long pulse beams of up to 1.6 microsecond length were also demonstrated. The paper describes the startup operation, reviews the performance characteristics, and discusses the beam transport optics used to deliver 1 to 4 GeV beams to nuclear physics experiments in End Station A.
Report Numbers
E 1.99:slac-pub-3615 E 1.99: conf-850504-68 conf-850504-68 slac-pub-3615