Completion Report for Multi-Site Incentive MRT 2779 Implement ASC Tripod Initiative by 30SEP08 [electronic resource].
- Published:
- Washington, D.C. : United States. Dept. of Energy, 2008.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description:
- PDF-file: 45 pages; size: 2.3 Mbytes
- Additional Creators:
- Lawrence Berkeley National Laboratory, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- This report provides documentation and evidence for the completion of the deployment of the Tripod common operating system (TripodOS, also known as and generally referred to below as TOSS). Background documents for TOSS are provided in Appendices A and B, including the initial TOSS proposal accepted by ASC HQ and Executives in July 2007 and a Governance Model defined by a Tri-Lab working group in September 2007. Appendix C contains a document that clarifies the intent and requirements for the completion criteria associated with MRT 2779. The deployment of TOSS is a Multi-Site Incentive from the ASC FY08-09 Implementation Plan due at the end of Quarter 4 in FY08.
- Report Numbers:
- E 1.99:llnl-tr-407208
llnl-tr-407208 - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
09/22/2008.
"llnl-tr-407208"
Sturtevant, J; Noe, J; Cupps, K; Cerutti, J; East, D; Loncaric, J. - Funding Information:
- W-7405-ENG-48
View MARC record | catkey: 14343463