Actions for Activation caused by proton beam losses in Accelerator Production of Tritium LINAC [electronic resource].
Activation caused by proton beam losses in Accelerator Production of Tritium LINAC [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1996.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 11 pages : digital, PDF file
- Additional Creators
- Los Alamos National Laboratory, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- A variety of accelerator designs are being considered for the Accelerator Production of Tritium (APT) project at Alamos National Laboratory. Because activation of the structural components of the accelerator is considered a major radiation protection issue, we have developed a computational methodology to estimate quantitatively radionuclide inventories and gamma dose rates resulting from accelerator operation. The work presented here illustrates the use of our computational methodology by focusing on the 20 and 100 MeV sections of the Bridge-Coupled Drift Tube LINAC (BCDTL), and the 100 and 1000 MeV sections of the Coupled Cavity LINAC (CCL).
- Report Numbers
- E 1.99:la-ur--96-0178
E 1.99: conf-960415--13
conf-960415--13
la-ur--96-0178 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
03/01/1996.
"la-ur--96-0178"
" conf-960415--13"
"DE96007201"
American Nuclear Society (ANS) Radiation Protection and Shielding Division topical meeting on advancements and applications in radiation protection and shielding, Falmouth, MA (United States), 21-25 Apr 1996.
Wilson, W.B.; Waters, L.S.; Eaton, S.L.; Beard, C.A.; Daemen, L.L. - Funding Information
- W-7405-ENG-36
View MARC record | catkey: 14357918