Physics analysis of the gang partial rod drive event [electronic resource].
- Published:
- Washington, D.C. : United States. Dept. of Energy, 1992.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description:
- 14 pages : digital, PDF file
- Additional Creators:
- Westinghouse Savannah River Company, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- During the routine positioning of partial-length control rods in Gang 3 on the afternoon of Monday, July 27, 1992, the partial-length rods continued to drive into the reactor even after the operator released the controlling toggle switch. In response to this occurrence, the Safety Analysis and Engineering Services Group (SAEG) requested that the Applied Physics Group (APG) analyze the gang partial rod drive event. Although similar accident scenarios were considered in analysis for Chapter 15 of the Safety Analysis Report (SAR), APG and SAEG conferred and agreed that this particular type of gang partial-length rod motion event was not included in the SAR. This report details this analysis.
- Report Numbers:
- E 1.99:wsrc-tr--92-401
wsrc-tr--92-401 - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
08/01/1992.
"wsrc-tr--92-401"
"DE93017293"
Frost, R.L.; Boman, C. - Type of Report and Period Covered Note:
- Topical; 08/01/1992 - 08/01/1992
- Funding Information:
- AC09-89SR18035
View MARC record | catkey: 14365404