Update of HB-line consequences based on new meteorological and population databases in AXAIR89Q [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1994.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 17 pages : digital, PDF file
- Additional Creators
- Westinghouse Savannah River Company, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- Additional analyses and upgrading of the Safety Analysis Report (SAR) and Justification for Continued Operation (JCO) is needed for an Environmental Assessment (EA) currently being prepared for HB-Line. Since the JCO and SAR do not include population doses for two accidents; a propagated fire and a ground level release for an earthquake, this analysis will provide these doses. Population distribution information has been updated to 1992. This analysis will analyze the onsite worker at a distance of 640 meters from the release point using 50% meteorology in accordance with more recent DOE guidance. The doses will be calculated for all the accidents reported in the JCO. This analysis will update maximum offsite individual doses using a new meteorological database based on more recent data collected from 1987-1991. The new meteorological database results in a decrease in the dose from a release from H-Area.
- Report Numbers
- E 1.99:wsrc-rp--94-250
wsrc-rp--94-250 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
03/01/1994.
"wsrc-rp--94-250"
"DE94012378"
DelGenio, M.E. - Type of Report and Period Covered Note
- Topical; 03/01/1994 - 03/01/1994
- Funding Information
- AC09-89SR18035
View MARC record | catkey: 14365815