Production test IP-372-K uranium discharging during operation KE reactor [electronic resource].
- Published:
- Washington, D.C. : United States. Dept. of Energy, 1960.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description:
- 8 pages : digital, PDF file
- Additional Creators:
- General Electric Company, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- The purpose of this test is threehold; to test the workability of the flapper and/or ball cap -- actuator combination under reactor operating conditions to determine the effect on the K Reactor operating parameters of the rapid discharge of a column of slugs; and to ascertain the radiation levels present at various locations in the 105 Building when a column of irradiated slugs is discharged during operation.
- Report Numbers:
- E 1.99:hw--67207
hw--67207 - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
10/26/1960.
"hw--67207"
"DE94012435"
Carlson, P.A.; Frantz, C.E. - Type of Report and Period Covered Note:
- Topical; 10/01/1960 - 10/01/1960
- Funding Information:
- AC06-76RL01830
View MARC record | catkey: 14367864