105-N charge-discharge rates [electronic resource].
- Published:
- Washington, D.C. : United States. Dept. of Energy, 1959.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description:
- 5 pages : digital, PDF file
- Additional Creators:
- General Electric Company, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- Figures have and can be generated that indicate a higher charge-discharge rate if required before 105-N will be comparable with existing reactors. Also, these figures show an apparent operating cost incentive to increase the charge-discharge rates proposed for 105-N. Although these figures may be true by themselves, other figures developed from the same information and stated on a basis that affords a true comparison, show that the proposed rates for 105-N are compatible with those in existing reactors. However, the accomplishments of existing reactors should be considered as a guide only and not as Criteria since the design basis has already been established for Project CAI-816. An average charge-discharge rate has been proposed for 105-N that is compatible with the two main ground rules of the Project. Namely, the capital cost limitation and the plant factor. This rate of 8 tubes/hr. is one that appears to be reasonable from the charge-discharge design aspects and there is a good possibility that it can be increased with operational experience.
- Report Numbers:
- E 1.99:hw--60959
hw--60959 - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
07/02/1959.
"hw--60959"
"DE94016408"
Nesbitt, J.F. - Type of Report and Period Covered Note:
- Topical; 07/01/1959 - 07/01/1959
- Funding Information:
- AC06-76RL01830
View MARC record | catkey: 14369907