100 Areas technical activities report [electronic resource] : Physics, July 1949
Published
Washington, D.C. : United States. Dept. of Energy, 1949. Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy.
The pile physics group reports on reactivity power coefficients from the production test No. 105-248-P, the water leak in B pile, graphite properties, xenon equations from the B pile shutdown of March 1946, and reactivity balance. The experimental physics group headed by J.M. West reports on graphite testing, the P-11 project, and shielding. The experimental physics group headed by E.B. Montgomery reports on diffusion length measurements in the DR and H piles. (GHH)