Increased water flows and pressures to 105 buildings [electronic resource].
Published
Washington, D.C. : United States. Dept. of Energy, 1951. Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy.
Document HW-21096, inquires regarding changes in equipment, so that various proposed flows of process water to each of the present production units, at several 105 control room pressures, may be effected. The proposed conditions are shown in table form in the report. For the purpose of calculations upon which this letter is based, the pressure used here is that which is recorded at the 105 control room ``inlet`` panel. It is actually the top of riser pressure, plus static head between the recorder and the point of pressure tap.