Actions for Hanford Atomic Products Operation monthly report, August 1956 [electronic resource].
Hanford Atomic Products Operation monthly report, August 1956 [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1956.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 359 pages : digital, PDF file
- Additional Creators
- General Electric Company, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- This document presents a summary of work and progress at the Hanford Engineer Works for August 1956. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summarizes work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Sciences, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.
- Report Numbers
- E 1.99:hw--45115-del.
hw--45115-del. - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
09/28/1956.
"hw--45115-del."
"DE92016479" - Type of Report and Period Covered Note
- Monthly; 08/01/1956 - 08/31/1956
- Funding Information
- AC06-76RL01830
View MARC record | catkey: 14373329