Isotope Production Facility Conceptual Thermal-Hydraulic Design Review and Scoping Calculations [electronic resource].
Published
[Washington, D.C.] : United States. Dept. of Energy. Office of Nonproliferation and National Security, 1998. Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy.
The thermal-hydraulic design of the target for the Isotope Production Facility (IPF) is reviewed. In support of the technical review, scoping calculations are performed. The results of the review and scoping calculations are presented in this report.