Engineering report for interim solids removal modifications of the Steam Plant Wastewater Treatment Facility [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1995.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 8 pages : digital, PDF file
- Additional Creators
- United States. Department of Energy and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- The Steam Plant Wastewater Treatment Facility (SPWTF) treats wastewater from the Y-12 Plant coal yard, steam plant, and water demineralizer facility. The facility is required to comply with National Pollutant Discharge Elimination System (NPDES) standards prior to discharge to East Fork Poplar Creek (EFPC). The existing facility was designed to meet Best Available Technology (BAT) standards and has been in operation since 1988. The SPWTF has had intermittent violations of the NPDES permit primarily due to difficulties in complying with the limit for total iron of 1.0 ppM. A FY-1997 Line Item project, SPWTF Upgrades, is planned to improve the capabilities of the SPWTF to eliminate non-compliances with the permit limits. The intent of the Interim Solids Removal Modification project is to improve the SPWTF effluent quality and to provide pilot treatment data to assist in the design and implementation of the SPWTF Upgrades Line Item Project.
- Report Numbers
- E 1.99:y/en--5331
y/en--5331 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
04/01/1995.
"y/en--5331"
"DE96003265"
Oak Ridge Y-12 Plant, TN (United States) - Funding Information
- AC05-84OR21400
View MARC record | catkey: 14411775