Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q [electronic resource].
- Published:
- Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 2000.
- Physical Description:
- 56 pages : digital, PDF file
- Additional Creators:
- United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.
- Report Numbers:
- E 1.99:rpp-5801, rev.0
rpp-5801, rev.0 - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
02/14/2000.
"rpp-5801, rev.0"
"EDT-624872"
KOCH, M.R.
CHG (US)
ENVIRONMENTAL MANAGEMENT (US) - Type of Report and Period Covered Note:
- Final; 02/14/2000 - 02/14/2000
- Funding Information:
- AC27-99RL14047
View MARC record | catkey: 14412373