Actions for Statement of work for architect-engineer services, initial pretreatment module [electronic resource].
Statement of work for architect-engineer services, initial pretreatment module [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1994.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 108 pages : digital, PDF file
- Additional Creators
- Westinghouse Electric Corporation, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- This Statement of Work describes the Architect-Engineer services to be provided by Raytheon/BNFL in providing a conceptual design (Contract TGW-SVV-063869) for the Initial Pretreatment Module (IPM), Project W-236B, at the Hanford site, Richland, Washington. The IPM Project, a radiochemical process facility, will be designed and constructed for an initial phase of waste pretreatment, which will be for the removal of cesium from supernatant wastes to produce a Low-level waste (LLW) stream to a vitrification facility. The design shall also accommodate side streams of High-Level Waste (HLW) fractions that will be directed to suitable, existing storage tanks where they will be recombined with an additional high-activity waste fraction generated from pretreatment of the tank waste sludges and solids. This combined high-activity waste fraction will be immobilized as glass and disposed in a geological repository.
- Report Numbers
- E 1.99:whc-sd-w236b-sow--001
whc-sd-w236b-sow--001 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
09/15/1994.
"whc-sd-w236b-sow--001"
"DE95000801"
Sowa, K.B. - Type of Report and Period Covered Note
- Topical; 08/01/1994 - 08/01/1994
- Funding Information
- AC06-87RL10930
View MARC record | catkey: 14414722