Safety assessment of discharge chute isolation barrier preparation and installation [electronic resource].
- Published:
- Washington, D.C. : United States. Dept. of Energy, 1994.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description:
- 23 pages : digital, PDF file
- Additional Creators:
- Westinghouse Electric Corporation
United States. Department of Energy
United States. Department of Energy. Office of Scientific and Technical Information - Access Online:
- www.osti.gov
- Summary:
- The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparison of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions were made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classification.
- Subject(s):
- Note:
- Published through SciTech Connect.
09/29/1994.
"whc-sd-snf-sarr--002"
"DE95001518"
"35AF11201/35AF11202"
Meichle, R.H. - Type of Report and Period Covered Note:
- Final; 09/01/1994 - 09/01/1994
- Funding Information:
- AC06-87RL10930
View MARC record | catkey: 14415641