Actions for SRS ES and H Standards Compliance Program Implementation Plan. Revision 1 [electronic resource].
SRS ES and H Standards Compliance Program Implementation Plan. Revision 1 [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1993.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 17 pages : digital, PDF file
- Additional Creators
- Westinghouse Savannah River Company, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB`s initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the U.S. Department of Energy (DOE), called for three actions: identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; assessment of the adequacy of those standards for protecting public health and safety; and determination of the extent to which they have and are being implemented. The purpose of this Implementation Plan is to define the single program for all sitewide and facility 90-2 ES and H Standards Compliance efforts, which will satisfy the HQ Implementation Plan, avoid duplicate efforts, be as simple and achievable as possible, include cost-saving innovations, use a graded approach based on facility hazards and future needs of facilities, and support configuration control for facility requirements. The Defense Waste Processing Facility (DWPF) has been designated a pilot facility for the 90-2 program and has progressed with their facility program ahead of the site-level program. The DWPF, and other Government-Owned Contractor-Operated (GOCO) facilities that progress on an enhanced schedule, will serve as pilot facilities for the site-level program. The lessons learned with their requirement identifications, and their assessments of the adequacy of and their compliance with these requirements will be used to improve the efficiency of the site-level and subsequent programs.
- Report Numbers
- E 1.99:wsrc-tr--93-347-rev.1
wsrc-tr--93-347-rev.1 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
09/08/1993.
"wsrc-tr--93-347-rev.1"
"DE94004440"
Hearn, W.H. - Type of Report and Period Covered Note
- Topical; 09/01/1993 - 09/01/1993
- Funding Information
- AC09-89SR18035