Actions for Scavenging of stored TBP waste [electronic resource].
Scavenging of stored TBP waste [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1955.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 19 pages : digital, PDF file
- Additional Creators
- General Electric Company, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- The reactivation of B-Plant and the continued operation of T-Plant under the 4X Program have led to the problem of obtaining additional underground tankage in both 200 East Area and 200 West Area for the storage of B-Plant metal waste, second cycle waste sludge, 224-B Building waste sludge, B and T-Plant first cycle waste scavenged sludge, and perhaps additional TBP concentrated wastes. As a result of this problem, a study has been made to determine the engineering feasibility of using a scavenging type process, similar to that used in the TBP Plant, for recovering the storage space in tanks currently filled with TBP wastes. The results of this study are reported herein. The purpose of this document is to present the scope, justification, and engineering feasibility of a nickel ferrocyanide scavenging system for stored TBP wastes.
- Report Numbers
- E 1.99:hw--34487
hw--34487 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
02/28/1955.
"hw--34487"
"DE94006697"
Poucher, F.W.; Ingalls, W.P. - Type of Report and Period Covered Note
- Topical; 02/01/1955 - 02/01/1955
- Funding Information
- AC06-76RL01830
View MARC record | catkey: 14421352