Determining a cost/effectiveness/safety tradeoff methodology for strategic nuclear warheads [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1992.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 26 pages : digital, PDF file
- Additional Creators
- Lawrence Livermore National Laboratory, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- Department of Energy national laboratories are charged with anticipating with a long leadtime which technologies for nuclear warheads should be developed. The Safe Warhead System Study was constituted to provide Lawrence Livermore National Laboratory management with information and suggestions for making such decisions for enhanced safety warheads. The Minuteman III replacement warheads were analyzed as a test case and that information was used to identify and describe the dominant issues, to develop a methodology and to make initial recommendations. The test case work resulted in several insights into how ongoing design and engineering interacts with the technology ranking and on how to cope with the ubiquitous uncertainties relating to our current ICBM force.
- Report Numbers
- E 1.99:ucrl-jc--113621
E 1.99: conf-9204148--6
conf-9204148--6
ucrl-jc--113621 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
04/27/1992.
"ucrl-jc--113621"
" conf-9204148--6"
"DE93018633"
33. joint The Institute of Management Science/Operation Research Society of America (TIMS/ORSA) national meeting,Orlando, FL (United States),29 Apr - 8 May 1992.
Hall, C.H.; Erickson, S.A. Jr. - Funding Information
- W-7405-ENG-48
View MARC record | catkey: 14656780