OVERVIEW OF THE AGS COLD SNAKE POWER SUPPLIES AND THE NEW RHIC SEXTUPOLE POWER SUPPLIES [electronic resource].
- Published:
- Washington, D.C. : United States. Dept. of Energy, 2007.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Additional Creators:
- Brookhaven National Laboratory, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- The two rings in the Relativistic Heavy Ion Collider (RHIC) were originally constructed with 24 sextupole power supplies, 12 for each ring. Before the start of Run 7, 24 new sextupole power supplies were installed, 12 for each ring. Individual sextupole power supplies are now each connected to six sextupole magnets. A superconducting snake magnet and power supplies were installed in the Alternating Gradient Synchrotron (AGS) and commissioned during RHIC Run 5, and used operationally in RHIC Run 6. The power supply technology, connections, control systems and interfacing with the Quench Protection system for both these systems will be presented.
- Report Numbers:
- E 1.99:bnl--77513-2007-cp
bnl--77513-2007-cp - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
06/25/2007.
"bnl--77513-2007-cp"
22ND PARTICLE ACCELERATOR CONFERENCE; ALBUQUERQUE, NEW MEXICO; 20070625 through 20070629.
BRUNO,D.; GANETIS, G.; SANDBERG, J.; LOUIE, W. - Funding Information:
- DE-AC02-98CH10886
18037
View MARC record | catkey: 14679745