Long-term stability of the APS storage ring [electronic resource].
- Published:
- Washington, D.C. : United States. Dept. of Energy, 2000.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description:
- vp : digital, PDF file
- Additional Creators:
- Argonne National Laboratory, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- The Advanced Photon Source (APS), a third-generation synchrotron light source, was commissioned in 1995 at Argonne National Laboratory and has been fully operational for beamline users since 1997. The APS storage ring can accommodate up to 68 user beamlines; about 70% of the available beamlines are currently in use by various collaborative access teams (CATs). The 7-GeV synchrotron light source produces light in the soft to hard x-ray range that is used for research in such areas as x-ray instrumentation; material, chemical and atomic sciences; biology; and geo/soil/environmental sciences. For the successful operation of an x-ray light source such as the Advanced Photon Source, the long-term stability of the concrete floor supporting the beam components and user beamlines is crucial. Settlements impact the orbit and location of the x-ray source points as well as the position of the x-ray beamlines. This paper compares the results of two successive resurveys of the APS accelerator components performed in 1995 and 1998.
- Report Numbers:
- E 1.99:ls-284
ls-284 - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
03/16/2000.
"ls-284"
Friedsam, H.; Penicka, M.; Error, J. - Type of Report and Period Covered Note:
- Topical;
- Funding Information:
- W-31109-ENG-38
View MARC record | catkey: 14687597