Actions for D-Zero prospects for Run II physics [electronic resource].
D-Zero prospects for Run II physics [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy. Office of Energy Research, 2001.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 258 Kilobytes pages : digital, PDF file
- Additional Creators
- Fermi National Accelerator Laboratory, United States. Department of Energy. Office of Energy Research, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- Run II at the Tevatron will begin in the spring of 2001. With p{bar p} collisions at √s = 2.0 TeV and an expected instantaneous luminosity of 2 x 10³² cm⁻² s⁻¹, D0 is expected to collect an integrated luminosity of 2 fb⁻¹ in the first two years of running. The ongoing upgrade of the detector will allow the experiment not only to take full advantage of the high luminosity but will also allow for a rich B physics program at D0. In this paper the prospects for some important B physics measurements will be reviewed. These measurements include CP violation, B{sub s} mixing, rare B decays, and lifetimes and mass measurements of bottom particles such as the Λ{sub b} and B{sub c}.
- Report Numbers
- E 1.99:fermilab-conf-01/230-e
fermilab-conf-01/230-e - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
08/24/2001.
"fermilab-conf-01/230-e"
Beauty 2000, Sea of Galilee (IL), 09/13/2000--09/18/2000.
Gaston R Gutierrez. - Funding Information
- AC02-76CH03000
View MARC record | catkey: 14688002