Actions for FIELD QUALITY CONTROL THROUGH THE PRODUCTION PHASE OF RHIC ARC DIPOLES [electronic resource].
FIELD QUALITY CONTROL THROUGH THE PRODUCTION PHASE OF RHIC ARC DIPOLES [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy. Office of Energy Research, 1995.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 3 pages : digital, PDF file
- Additional Creators
- Brookhaven National Laboratory, United States. Department of Energy. Office of Energy Research, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- The field quality in the arc dipoles built thus far for the Relativistic Heavy Ion Collider (RHIC) not only meets machine requirements, but is significantly better than that expected from scaling laws based on previous large scale superconducting magnet production for particle accelerators. In this paper we describe the evolution of the present cross section and the design philosophy that has led to these improvements. The techniques described here have been found quite efficient to adopt in the production environment, where schedule and cost considerations become important. Moreover, the techniques developed during the R and D program have resulted in making the saturation induced harmonics negligible, despite the fact that the iron is very close to the coil.
- Report Numbers
- E 1.99:bnl--68136
E 1.99: ka0403011
ka0403011
bnl--68136 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
05/01/1995.
"bnl--68136"
" ka0403011"
"KA0403011"
PARTICLE ACCELERATOR CONFERENCE 1995, DALLAS, TX (US), 05/01/1995--05/05/1995.
KAHN,S.; GUPTA,R.; JAIN,A. - Funding Information
- AC02-98CH10886
08042
View MARC record | catkey: 14690666