Actions for Preparing accelerator systems for the RHIC sextant commissioning [electronic resource].
Preparing accelerator systems for the RHIC sextant commissioning [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy. Office of Energy Research, 1997.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 4 pages : digital, PDF file
- Additional Creators
- Brookhaven National Laboratory, United States. Department of Energy. Office of Energy Research, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- The Relativistic Heavy Ion Collider (RHIC) construction is progressing steadily towards completion in 1999 when beams will circulate in both collider rings. One of the major tests of the RHIC project was the commissioning of the first sextant with gold ion beams in early 1997. This is a report on preparation of the RHIC accelerator systems for the first sextant test. It includes beam position monitors, timing, injection correction through the magnetic septum and kickers, current transformers, flags and the ionization beam profile monitors, beam loss monitors, beam and quench permit link system, power supply controls, and the configuration database system. The software and hardware development and coordination of the different systems before commissioning were regularly checked during bi-weekly, and (later) weekly, progress report meetings.
- Report Numbers
- E 1.99:bnl--63923
E 1.99: conf-970503--115
conf-970503--115
bnl--63923 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
07/01/1997.
"bnl--63923"
" conf-970503--115"
"DE97006691"
17. IEEE particle accelerator conference, Vancouver (Canada), 12-16 May 1997.
Trbojevic, D.; Ahrens, L.; Pilat, F. - Funding Information
- AC02-76CH00016
View MARC record | catkey: 14691058