Third harmonic rf cavity for transition crossing in the Main Ring [electronic resource].
Published
Washington, D.C. : United States. Dept. of Energy, 1992. Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy.
This paper reports the present status and future plans of the implementation of the transition crossing RF harmonic system at Fermilab. The test is being carried out in the Main Ring (MR) which is used as a 150 GeV injector to the Tevatron.
Report Numbers
E 1.99:fnal/c-92/227 E 1.99: conf-9206310--1 conf-9206310--1 fnal/c-92/227
Published through SciTech Connect. 08/01/1992. "fnal/c-92/227" " conf-9206310--1" "DE93002818" Superconducting Super Collider Laborabory (SSCL) rf workshop, Argonne, IL (United States), 25-26 Jun 1992. Bhat, C.M.