Actions for DISTRIBUTED GENERATION POWER UNITS AT MARGINAL OIL WELL SITES [electronic resource].
DISTRIBUTED GENERATION POWER UNITS AT MARGINAL OIL WELL SITES [electronic resource].
- Published
- Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy, 2003.
- Physical Description
- vp : digital, PDF file
- Additional Creators
- United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- The CEC approved funding on April 9, 2003 for $1,000,000.00 instead of the $1,500,000.00 COPE requested for the project. A kickoff meeting with the California Energy Commission (CEC) was held on Monday, April 14, 2003, in their Sacramento, CA offices. Mark Carl, IOGCC project manager for the DOE grant, attended this meeting, along with Bob Fickes with COPE, Edan Prabhu, Mike Merlo and CEC officials. The change in funding by the CEC required a modification in the scope of work and an amended form DOE F 4600.1. The modifications were completed and the IOGCC received approval to commence work on the project on May 9, 2003. On May 29, 2003, Virginia Weyland with DOE/NETL, Mark Carl with IOGCC, and Bob Fickes with COPE, Edan Prabhu and Mike Merlo, consultants with COPE, participated in a teleconference kick-off meeting. During May, 2003, COPE canvassed its membership for potential locations for the four test sites. They received a very good response and have identified at least two potential sites for each of the four test sites. COPE has been obtaining gas samples from the various potential lease sites for analyses to verify the chemical properties analyses which the oil and gas producers provided during the initial contact period. The St. James project located at 814 W. 23 rd Street in Los Angeles, California, was selected as the first test site for the project. A Project Advisory Committee (PAC) was established in May, 2003. The following representatives from each of the following areas of expertise comprise the PAC membership. Acquisition of permits for the initial test site has required drawn out negotiations with CEC which has hindered progress on the technical aspects of the project. The technical aspects will begin aggressively beginning in October, 2003. The Southern California Air Quality Management District (SCAQMD) donated three Capstone micro-turbines to the project. These micro-turbines will be utilized at the St. James Project site located in Los Angeles, California. This site will fulfill the requirements of the medium BTU test site. It is anticipated that start-up of operations will begin during late December, 2003 or early January, 2004.
- Report Numbers
- E 1.99:829674
- Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
10/29/2003.
Mark A. Carl.
Interstate Oil and Gas Compact Commission (US)
(US) - Type of Report and Period Covered Note
- Other Publications;
- Funding Information
- FC26-02NT15444
View MARC record | catkey: 14703218