Actions for Recovery of bypassed oil in the Dundee Formation using horizontal drains. 2nd Quarterly report, April 1, 1994--June 30, 1994 [electronic resource].
Recovery of bypassed oil in the Dundee Formation using horizontal drains. 2nd Quarterly report, April 1, 1994--June 30, 1994 [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 1994.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 8 pages : digital, PDF file
- Additional Creators
- Michigan Technological University, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- A meeting of project personnel was held in Traverse City, MI, on June 8, 1994 to initiate the DOE contract. The drilling program, which will be the project`s first major undertaking, was discussed in detail. Data from 12 Dundee fields, including Crystal Field, have been entered in a computer database by project staff at WMU. Structure contour maps and isopach maps have been generated for all horizons in these fields using Terrasciences` TerraStation computer program. Arrangements have been made to purchase digitized logs of every well that produces or has produced from the Dundee Formation in the state of Michigan. Twenty to thirty cores of the Dundee Formation from wells throughout the state of Michigan are currently available. Cuttings samples are also available from 60 to 100 Michigan wells. A well in the project area has been designed and permitted and will soon be drilled. The well will have both a horizontal and a vertical leg. The vertical leg well will be cored through the producing interval of the Dundee Formation and the cores analyzed for porosity, permeability, and fluid saturations. A full set of well logs will be run, including gamma ray, porosity, resistivity, and geochemical logs. The horizontal leg will be drilled as a sidetrack from the vertical test well. If commercial amounts of hydrocarbons are encountered, the horizontal well will be placed on production. It is expected that drilling will commence in August, 1994, and will take 10 to 12 days to complete.
- Report Numbers
- E 1.99:doe/bc/14983--1
doe/bc/14983--1 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
07/01/1994.
"doe/bc/14983--1"
"DE94018835"
Wood, J.R. - Type of Report and Period Covered Note
- Quarterly; 04/01/1994 - 06/30/1994
- Funding Information
- FC22-94BC14983
View MARC record | catkey: 14704165