Design and construction of the EBT-P development coils [electronic resource].
- Published:
- Oak Ridge, Tenn. : Oak Ridge National Laboratory, 1981.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description:
- Pages: 5 : digital, PDF file
- Additional Creators:
- Oak Ridge National Laboratory and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- The ELMO Bumpy Torus Proof-of-Principle (EBT-P) plasma physics device is a large mirror fusion machine scheduled to begin operation in 1985. It will have 36 superconducting mirror magnets arranged in a bumpy torus on a 4.5 m radius. Presented here are several of the design parameters and supporting design/analysis that have not been published until now due to contractural arrangements between ORNL and the EBT-P subcontractors.
- Report Numbers:
- E 1.99:conf-811040-78(draft)
conf-811040-78(draft) - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
01/01/1981.
"conf-811040-78(draft)"
"DE82002878"
9. symposium on engineering problems of fusion research, Chicago, IL, USA, 26 Oct 1981.
Brown, R.L.; Gray, W.H.; Ballou, J.K.; Lubell, M.S.; McManamy, T.J. - Funding Information:
- W-7405-ENG-26
View MARC record | catkey: 14754103