WASTE HANDLING BUILDING ELECTRICAL SYSTEM DESCRIPTION DOCUMENT [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy, 2000.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Additional Creators
- United States. Department of Energy. Office of Scientific and Technical Information and United States. Department of Energy
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- The Waste Handling Building Electrical System performs the function of receiving, distributing, transforming, monitoring, and controlling AC and DC power to all waste handling building electrical loads. The system distributes normal electrical power to support all loads that are within the Waste Handling Building (WHB). The system also generates and distributes emergency power to support designated emergency loads within the WHB within specified time limits. The system provides the capability to transfer between normal and emergency power. The system provides emergency power via independent and physically separated distribution feeds from the normal supply. The designated emergency electrical equipment will be designed to operate during and after design basis events (DBEs). The system also provides lighting, grounding, and lightning protection for the Waste Handling Building. The system is located in the Waste Handling Building System. The system consists of a diesel generator, power distribution cables, transformers, switch gear, motor controllers, power panel boards, lighting panel boards, lighting equipment, lightning protection equipment, control cabling, and grounding system. Emergency power is generated with a diesel generator located in a QL-2 structure and connected to the QL-2 bus. The Waste Handling Building Electrical System distributes and controls primary power to acceptable industry standards, and with a dependability compatible with waste handling building reliability objectives for non-safety electrical loads. It also generates and distributes emergency power to the designated emergency loads. The Waste Handling Building Electrical System receives power from the Site Electrical Power System. The primary material handling power interfaces include the Carrier/Cask Handling System, Canister Transfer System, Assembly Transfer System, Waste Package Remediation System, and Disposal Container Handling Systems. The system interfaces with the MGR Operations Monitoring and Control System for supervisory monitoring and control signals. The system interfaces with all facility support loads such as heating, ventilation, and air conditioning, office, fire protection, monitoring and control, safeguards and security, and communications subsystems.
- Report Numbers
- E 1.99:sdd-hbe-se-000001 rev 01 icn 01
sdd-hbe-se-000001 rev 01 icn 01 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
06/23/2000.
"sdd-hbe-se-000001 rev 01 icn 01"
"MOL.20000802.0001 DC#25528"
S.C. Khamamkar.
View MARC record | catkey: 14758080